Getting an early start at 87 Airdrie Road

87 Airdrie today and (inset) original
They’re getting an early start on the re-building season at 87 Airdrie Road. The original structure at this address has been reduced to three walls on a very chilly Monday, March 18, 2013. That’s it inset at the upper left. Trust all the neighbors are at peace with the plan. We’ll be back in about threw months to see how it’s going. From a quick look around the relatively busy winter season is going to translate into an equally busy spring in Leaside.