“My work is done here” might be the caption as Metrolinx hauls out the two boring machines that made the tunnels (east and westbound) along Eglinton Ave from Laird Drive to Yonge St. Work was scheduled for most of the day Monday at Eglinton and Holly St.
The cutting head is out! The rest of the TBM will be extracted over the next few days. #TBMDon #MXBuild pic.twitter.com/HZUyblJ6zv
— Crosstown (@CrosstownTO) March 13, 2017