A redesigned proposal for a five-story condominium building at 922 Millwood Rd (at Randolph Rd) contains ground-floor retail space. This is the site of the former Stanley Cleaners. The designers, are Makow Associates Architects for Hamr Millwood Investments. The revised plan calls for a building rising 22 metres, marking a slight increase from the 21.03 height proposed in 2019. The building is planned to contain 30 condominium units, reduced from the 35 proposed in 2019. These are now planned in a mix of 16 one-bedrooms, 6 two-bedrooms, and 8 three-bedroom units. A Facebook post raises this question:
The delay to approving this project was the community’s concern regarding underground parking for 30 condo units being a corner lot which backs onto Krawchuk Lane beside Randolph Road where will the entrance/exit be for these vehicles? Being a safety issue for it’s potential new residents this question is yet to be answered