Metrolinx has again told local media that the Eglinton LRT may not be open in 2022. In a statement to Daily Hive, Metrolinx said it was “working diligently with our contractor to get it substantially completed by the end of 2022″, leaving open the possibility of a 2023 kickoff for ridership. Prior to this, plans for the Eglinton Crosstown had called for it to be operational at some point in 2022 — a date that had already been pushed from the originally scheduled 2020.
METROLINX TIMELAPSE VIDEO
Laird Station back to the Eglinton Maintenance and Storage Facility (EMSF)