Those neatly stacked cones won’t stay that way for long — road resurfacing is scheduled to begin July 21st, 2025 on Bessborough Drive, from Airdrie Road to Parkhurst Boulevard. The City of Toronto says work will include curb and sidewalk repairs, sewer adjustments, and full road repaving. The project is expected to run through mid-September, weather permitting. Residents should anticipate noise, dust, and traffic impacts during working hours, typically 7 a.m. to 7 p.m., Monday through Friday with work after hours and on weekends as required.
